Can Smath update/calculate only that something that has changed/updated?

Can Smath update/calculate only that something that has changed/updated? - without calculating again the hole page every time when a change was made - Сообщения

#1 Опубликовано: 25.12.2024 20:33:49
Cornel

Cornel

2 сообщений из 78 понравились пользователям.

Группа: User

Hi,

When I change something in the Smath sheet Smath calculates the hole page again every time I changed something, which is time consuming when having more calculations. I am wondering if Smath can be made to behave in such a way when changing something individually in the sheet Smath to calculate/update only that something that has changed?
  • Новые сообщения Новые сообщения
  • Нет новых сообщений Нет новых сообщений